Ballarat Energy Storage System | Solar Storage in Victoria

The Ballarat Energy Storage System has been turned on by the Victorian Government today – let’s take a look at this unique battery and see how it will help shape Victoria’s energy future!

Ballarat Energy Storage System

The Ballarat Energy Storage System has 30MW capacity and can output 30MWh – it’s located at the Ballarat terminal station and is owned by Australian energy company Ausnet. The battery storage units are Fluence branded, and were installed by Spotless and Downer Group.

Ballarat Energy Storage System
Ballarat Battery Energy Storage System (source: spotless.com)

ARENA and the Victorian Government will jointly provide $25 million in funding for both this project and the Gannawarra Energy Storage System (GESS). The project (BESS) is expected to end up costing around $35m. 

Lily D’Ambrosio, the minister for Energy, Environment and Climate Change, made a statement about the Ballarat Energy Storage System discussing the Government’s plans for Australia’s renewable energy future:

“We said we would deliver these large-scale batteries for Victoria, and that’s exactly what we’ve done,” she said.

“This is part of our plan to transition to a more affordable, reliable and clean energy system. We’re modernising our electricity grid, strengthening our energy security and delivering real action on climate change.”

According to RenewEconomy, the battery will be most useful in these three situations:

  1. It can help with congestion on Victoria’s transmission grid (especially as it’s installed at a network terminal rather than a wind or solar farm (which is the norm)). 
  2. It’ll help shore up the baseline load for Melbourne, especially during peak times when air conditioners and deconstructed latte machines are switched on en masse; and
  3. It’ll provide ‘key grid stability services’ like frequency control. 

Lastly, straight from the horses’s mouth:

The battery will store energy at times of relatively low value. The battery will use stored energy and use it at times of relatively high value. The project will also examine providing other grid services such as frequency control ancillary services (FCAS) and, should it be established under the electricity market rules, a Fast Frequency Response (FFR).

It’ll be fascinating to see how this works over the summer – we’ll, of course, also be keeping a close eye on the Tesla batteries at the Hornsdale Power Reserve to see if they’re able to continue delivering massive savings to the SA government. How long until the rest of the states follow suit? 

Read More Solar News:

Tesla Battery Power in Victoria – Powerpack

Tesla Battery Power in Victoria will be installed in regional Victoria this year, in time for the 2018/19 summer. The Turnbull government has committed up to $25m to Victoria’s first foray into large-scale, grid-connected batteries.

Tesla Battery Power in Victoria

Tesla Battery Power in Victoria - Tesla Powerpack
Tesla Battery Power in Victoria – Tesla Powerpack (source: tesla.com)

The Age is reporting that ARENA (the Australian Renewable Energy Agency) and the Turnbull government will contribute $25m to the $50m project, which will be located in Western Victoria. The area has been identified as having a ‘vulnerable’ energy transmission network and will benefit immensely from the project. The other $25m of funding will come from a consoria led by Spotless Sustainability Services, according to PV Tech.

The batteries will, similar to the South Australia Tesla battery plant, use Tesla’s lithium ion Powerpacks, but in slightly different configurations and with separate manufacturers. 

There will be two separate batteries – 

  1. A 25MW/50MWh Powerpack solar battery in Kerrang, supplied by Tesla, owned by Edify Energy and Wirsol, and connected to the Gannawarra solar farm in north-west Victoria.
  2. A 30MW/30MWh grid-connected Powerpack in Ballarat, supplied by global energy storage giant Fluence (a conglomeration of Siemens and AES), owned by AusNet and and built at a nearby station in Warrenheip. 

Both batteries will be operated by EnergyAustralia and a PPA (power purchase agreement) has already been signed. 

“ARENA is excited to be demonstrating the capabilities that these new batteries will provide in securing reliable electricity for western Victoria and to facilitate the Victoria’s transition to renewable energy,” ARENA’s Ivor Frischknecht said in a statement.

Victoria has a RET (renewable energy target) of 25% by 2020 and 40% by 2025. 

Minister Josh Frydenberg said: “Storage has been the missing piece of the energy jigsaw for a long time. Whether it’s Snowy 2.0 in New South Wales and Victoria, the Battery of the Nation projects in Tasmania or various initiatives, including a 30MW battery, in South Australia, we are expanding, exploring and funding energy storage right across the country.”

Back in January we wrote about the Bulgana Green Power Hub – a 194MW wind farm and a 20MW / 35MWh battery storage facility which will be built by French renewable energy developer Neoen separately to the Gannawarra solar farm Tesla battery or the Ballarat terminal station Powerpack. So there’s plenty on the horizon for energy storage in Victoria – it’ll be great to see how this affects some of the weaker parts of regional Victoria as it’s already had a fantastic effect in South Australia. 

 

Read More Solar News: