Summerhill solar farm commences construction.

The 5MW Summerhill solar farm will officially commence construction tomorrow – the farm will be located at the former Wallsend Borehole Colliery. 

Summerhill solar farm

Summerhill Solar Farm
Summerhill Solar Farm – Artist’s Rendition (source: smh.com.au)

All the renewable energy created by the Summerhill solar farm will be owned by the Newcastle City Council who will then be approximately 50% powered by renewable energy. 

Carnegie’s wholly owned subsidiary Energy Made Clean and JV partner Lendlease have been awarded the design and construction of the project, according to PV Magazine. It’ll be built on top of the former Wallsend Borehole Colliery. Read more about the tender here

According to the Sydney Morning Herald, the solar plant’s cost is around $8m, with $6.5m of this provided in the form of a loan by the Clean Energy Finance Corporation.

Initial modelling shows that this plant will save around $350,000 per annum, also noting that the city council’s cost of electricity has double over the past few years – making this a very attractive option to help offset the highly volatile wholesale price of electricity. It’s listed as ‘battery ready’ according to the Altenergy website. 

Nuatali Nelmes, the Lord Mayor of Newcastle, discussed the project in a media statement:

“The solar farm will produce enough energy to run the equivalent of all of our council facilities during the day, which represents significant environmental returns for ratepayers and millions of dollars in savings on electricity costs,” Mayor Nelmes said.

Further discussion shows that, although financial ramifications are very important, the eco-friendly nature of the project was ‘more than just money’:

“While cost savings are certainly a critical factor in our decision to build the solar farm, sustainability initiatives are about more than just money and our community expects us to be good environmental stewards,” Ms Nelmes continued.

This is a fantastic attitude and we look forward to seeing how well the SUmmerhill solar farm performs for the Newcastle City Council. More top news for council solar, which has been growing in leaps and bounds over the last 18 months. 

Read some more articles about council solar below!

Read More Solar News:

Goonumbla solar farm – deal with Snowy Hydro

The Goonumbla Solar Farm will supply energy to Snowy Hydro under a deal announced today. 

Goonumbla Solar Farm

FRV (Fotowatio Renewable Ventures), a large-scale solar developer based in Spain, already has five solar projects in Australia and will now start work on the Goonumbla Solar Farm. 

The 68MW solar farm will commence construction next April, and it’s expected that the project will be fully up and running by June 2020. It’ll produce around 195,000MWh, according to RenewEconomy

The wind and solar energy will be used to support Snowy’s pumped hydro storage generators who were previously pulling electricity from the grid to pump the water (to the tune of 2800 MWh, according to the Sydney Morning Herald).

“This agreement will put significant pressure on wholesale electricity prices which will lead to downward pressure on retail – household – energy prices,” Snowy Hydro chief executive Paul Broad said.

CEO of FRV, Daniel Sangi-Vela, discussed the project with the media:

“With this agreement we want to continue leading the production of renewable energy in Australia, a country that is showing a great commitment to boost renewable energy projects,” Mr. Sangi-Vela said.

“The Goonumbla Solar Farm will enable us to develop our expansion plans in the country, while contributing to a more sustainable future in Australia” he continued.

This is an exciting development for FRV, who have a proven track record in the space and are also responsible for the Lilyvale Solar Farm, Clare Solar Farm, Moree Solar Farm, Royalla Solar Farm, and the Winton Solar Farm

Snowy Hydro’s Electricity Tender

Goonumbla Solar Farm and Snowy Hydro
Goonumbla Solar Farm and Snowy Hydro (source: snowyhydro.com.au)

According to Snowy Hydro, their tender involved over 17,000MW of projects, with four solar farms and four wind farms winning contracts to supply Snowy Hydro Limited – an electricity generation and retailing company who own, manage and maintain the Snowy Mountains Hydro-electric scheme located in the Kosciuszko National Park.

Solar Farms:

  1. Goonumbla Solar Farm (FRV)
  2. Metz Solar Farm (Clenergy)
  3. Unnamed Total Eren Farm
  4. Unnamed Lightsource BP Farm.

Wind Farms:

  1. Dundonnel wind farm (Tilt)
  2. Murra Warra wind farm (Macquarie and RES Group)
  3. Unnamed CWP Renewables Wind Farm
  4. Unknown!

According to Snowy Hydro, these eight projects total 888MW and will generate around 2.8 terawatt hours of energy annually. If you’re interested, you can read more on the official website by clicking here

Read More Solar News:

Vales Point Solar Energy Project greenlit.

The $117m, 55MW Vales Point Solar Energy Project was greenlit by the Department of Planning today.

Vales Point Solar Energy Project

Vales Point Solar Energy Project Location
Vales Point Solar Energy Project Location

The project is going to be built by Delta (who were bidding for the Liddell power station earlier this year) and will co-exist with the coal-fired power station at Vales Point power station. Work is slated to commence early in 2019 and the solar farm will be built over 80 hectares of a rehabilitated ash dam. 

Delta Electricity Company Secretary Steve Gurney discussed the impact on the national grid:

“Delta recognises that both dispatchable power and low emission technologies have a role to play in supporting an affordable, reliable and sustainable national electricity grid” Mr Gurney said.

The Vales Point solar projet is expected to create over 100 solar jobs over the 18 months it’ll take to complete and will run for a 25 year lifespan. This will also extend the lifespan of the adjacent Vales Point power station which will now operate past its technical closure date of 2029.

Clay Preshaw, the director of Resource and Energy Assessment as the NSW Department of Planning and Environment, spoke about the farm’s potential impact on Australia’s solar future:

“This innovative project is one of the first in Australia where large-scale renewable and coal-fired energy facilities sit side by side,” Mr Preshaw said.

Vales Point Solar Energy Project Submissions

According to The Herald, the project was on public exhibition for a couple of months and 14 submissions were received. One of those was from the Lake Macquarie City Council, who support the project going ahead, but raised a concern about the impact the project may have on coastal saltmarsh:

“With the exception of the coastal saltmarsh issue, it appears that the ‘baseline’ for impact assessment is reasonable, predictions of impact are robust with suitable sensitivity testing, the assessment considers how to avoid and minimise impacts, and the proposal includes all reasonably feasible mitigation options,” the submission said.

Other than that it looks like everyone’s happy – it’ll be interesting to see how this works in unison with the coal-fired power plant and which one is more profitable!

 

Read More Solar News:

Karadoc Solar Farm | Solar Farms in Victoria

The Karadoc Solar Farm has launched and is currently exporting power to the grid – making it the biggest solar farm in Victoria (for now). 

Karadoc Solar Farm

Karadoc Solar Farm
Karadoc Solar Farm (source: baywa-re.com.au)

The 112MW Karadoc Solar Farm can power over 110,000 homes. It’s located 35km south of Mildura and is being built by German-based energy company Bay-Wa. With 112MW it is just marginally larger than the Bannerton solar park, which outputs 110MW and is responsible for powering solar powered trams in Melbourne

As per this article from RenewEconomy, brewer Carlton and United Breweries (CUB) has contracted the entire output of the project in its goal to become 100% powered by renewable energy. 

“This represents an important step in CUB’s commitment to 100 per cent of its electricity being sourced from renewables,” said CUB CEO Jan Craps at the time.

There are a number of large-scale solar farms in Victoria in various stages of their life cycle, but all will be online by summer 2018/19:

  • Bannerton Solar Farm (110MW)
  • Karadoc Solar Farm (112MW)
  • Yatpool Solar Farm (81MW – Also a Bay-Wa project)
  • Wemen Solar Farm (110MW – also known as the Wemen Sun Farm)
  • Ganawarra Solar Farm (50MW – Live)
  • Swan Hill Solar Farm (15MW – Live)
  • Kiamal Solar Farm (265MW DC – won’t be completed until the middle of next year)

This isn’t even mentioning the 928MW which will be generated via three solar and wind farms as per a recent Victoria government renewable energy tender. 

Daniel Gäfke, Managing Director of BayWa r.e. Solar Pte Ltd. “The Karadoc solar farm is the largest installation ever undertaken by BayWa r.e and is a great showcase of our ability to procure, design and build projects of this size anywhere in the world. Australia is a very important market for us and this investment is testament to the commitment we have to help increase Australia’s renewable energy capacity.”

Read More Solar News:

Ballarat Energy Storage System | Solar Storage in Victoria

The Ballarat Energy Storage System has been turned on by the Victorian Government today – let’s take a look at this unique battery and see how it will help shape Victoria’s energy future!

Ballarat Energy Storage System

The Ballarat Energy Storage System has 30MW capacity and can output 30MWh – it’s located at the Ballarat terminal station and is owned by Australian energy company Ausnet. The battery storage units are Fluence branded, and were installed by Spotless and Downer Group.

Ballarat Energy Storage System
Ballarat Battery Energy Storage System (source: spotless.com)

ARENA and the Victorian Government will jointly provide $25 million in funding for both this project and the Gannawarra Energy Storage System (GESS). The project (BESS) is expected to end up costing around $35m. 

Lily D’Ambrosio, the minister for Energy, Environment and Climate Change, made a statement about the Ballarat Energy Storage System discussing the Government’s plans for Australia’s renewable energy future:

“We said we would deliver these large-scale batteries for Victoria, and that’s exactly what we’ve done,” she said.

“This is part of our plan to transition to a more affordable, reliable and clean energy system. We’re modernising our electricity grid, strengthening our energy security and delivering real action on climate change.”

According to RenewEconomy, the battery will be most useful in these three situations:

  1. It can help with congestion on Victoria’s transmission grid (especially as it’s installed at a network terminal rather than a wind or solar farm (which is the norm)). 
  2. It’ll help shore up the baseline load for Melbourne, especially during peak times when air conditioners and deconstructed latte machines are switched on en masse; and
  3. It’ll provide ‘key grid stability services’ like frequency control. 

Lastly, straight from the horses’s mouth:

The battery will store energy at times of relatively low value. The battery will use stored energy and use it at times of relatively high value. The project will also examine providing other grid services such as frequency control ancillary services (FCAS) and, should it be established under the electricity market rules, a Fast Frequency Response (FFR).

It’ll be fascinating to see how this works over the summer – we’ll, of course, also be keeping a close eye on the Tesla batteries at the Hornsdale Power Reserve to see if they’re able to continue delivering massive savings to the SA government. How long until the rest of the states follow suit? 

Read More Solar News: