Mackay Council Solar Tender – 20 Sites

Mackay Council solar sites – the Mackay Regional Council has voted to invite tenders from 16 shortlisted respondents for the installation of solar systems at 20 council sites. 

Mackay Council Solar 

Mackay Council Solar Tender
Mackay Council Solar Tender (source: mackay.qld.gov.au)

An ordinary meeting held by the Mackay Regional Council yesterday voted to ask for tenders from shortlisted Expressions of Interest (EOI) respondents – a pool of 16.  They’re hoping to install solar systems at 20 sites around Mackay, according to the council website. These sites are:

  • Mackay Civic Precinct ArtSpace
  • Mackay Civic Precinct Administration Building
  • Mackay Civic Precinct Entertainment Centre and Convention Centre (MECC)
  • Wellington St Administration Building
  • The Dome – Dudley Denny City Library
  • Gordon White Library
  • Bluewater Lagoon
  • Paget Depot
  • Nebo Road Water Treatment Plant
  • Mt Bassett Sewer Pump Station
  • Mirani Depot Site
  • Paget Waste Transfer Station
  • Sarina Administration Centre including Bob Wood Hall and Library
  • Sarina Sewerage Treatment Plant
  • Mackay South Sewerage Treatment Plant
  • Mackay North Sewerage Treatment Plant
  • Dumbleton Weir
  • Mirani Sewerage Treatment Plant
  • Pioneer Swim Centre
  • Sydney St SPS

According to the Daily Mercury, the council’s yearly electricity bill is around $7 million – with $3 million of that from street lights and $2 million to power the city centre. Mackay Mayor Greg Williamson said that every $1 million the council saves could lead to a 1% reduction in rates bills. 

According to Mackay Regional Council CEO Craig Doyle they an assortment of options including a large-scale solar farm, waste-to-energy and a hydro turbine,  but ended up deciding on small-scale solar on specific sites instead: 

“We called for EOIs in September last year to investigate options around renewable energy and explored both site-specific and large-scale options,” Mr Doyle said. “It was decided that small-scale, site-specific solar systems would suit council’s needs best.”

Mr Doyle elaborated on the council’s ultimate aims: “This renewable energy program aligns with our Environmental Sustainability Strategy with one of the aims being to become a ‘low-carbon, resource-efficient and productive organisation’.

This news follows an encouraging trend of councils looking to minimise their ecological footprint – for example, Lismore City Council’s 100kw floating solar farm has recently been completed. This will help them reach the target of generating all required electricity via renewable sources by 2023 and we’d love to see other councils following suit.

 

 

 

Read More Solar News:

Floating Solar Farm in Lismore – Australia’s First

A floating solar farm has been installed in Lismore, northern New South Wales – it’s Australia’s first foray into floating solar and the Lismore City Council are hoping to have construction completed today. It should be fully functional by mid-December.

Floating Solar Farm

Floating Solar Farm in Lismore
Floating Solar Farm in Lismore (source: farmingthesun.net)

The 100kw floating solar farm, located at the Lismore City Council sewage plant, will be constructed by Suntrix and will be capable of generating around 12% of the power required by the sewage plant. 

“This particular pontoon will be floating by tomorrow, which is really exciting but the aim is to have it all connected and up and running by mid-December,” Lismore City Council’s Environmental Strategies Officer Sharyn Hunnisett said. Ms. Hunnisett also noted that this is merely the first step in Lismore City Council’s plan to power their sewage plant via renewable energy – telling the Northern Star that they are hoping to upgrade and expand the plant over the next six months. 

“We will have to do our calculations but we are hoping a minimum of 400kw in the future,” Ms. Hunnisett said.

Chief Project Officer, Geoff Fussell from Suntrix, said that the solar farm could power around 20 homes and will consist of 280 solar panels. He also told the ABC about the importance of building the farm so that it’s able to mitigate floods – “The panel island will float at the level of the water table but allows for 12 metres height expansion in heavy rains,” he said. “The solar panel anchors can withstand floods.”

The Lismore floating solar farm is one of many measures the Lismore City Council has put in place as per its Renewable Energy Master Plan. They have set themselves the ambitious and admirable target of generating all required electricity via renewable sources by 2023. This makes them the first regional council in Australia to commit to making its electricity supply 100% renewable. 

Solar power in Lismore is gaining a lot of traction recently, with Farming the Sun and Lismore City Council working in tandem on the floating solar farm, and also the construction of a 99kW rooftop PV solar system on top of the Goonellabah Sports & Aquatic Centre. The Rainbow Power Company, based in Nimbin, was responsible for the build at the Aquatic Centre. 

 

 

 

Read More Solar News: