Aldoga Solar Farm | Construction & Energy Submission

The Aldoga solar farm in Gladstone has lodged documents with the Federal Government and is one step closer to wards commencing the construction phase. 

Aldoga solar farm

Aldoga Solar Farm Gladstone Aerial Shot
Aldoga Solar Farm Gladstone Aerial Shot (source: dsdmip.qld.gov.au)

The Aldoga solar farm is to be designed, built and operated by global energy giant Acciona Energy, who have been in Australia since 2002 and certainly know the lay of the land. It will be a 265MW farm and Acciona have already signed a 30 year lease with the State Government. It will be located at Aldoga over 1,250 hectares and is hoped to act as a “precedent for the delivery of further economic opportunities offered from a growing renewable energy sector.”

State Development, Manufacturing, Infrastructure and Planning Minister Cameron Dick announced in April that Acciona Energy was chosen out of 16 applicants to build the solar farm in Gladstone.

“Combined with the renewable energy that will be generated, and the lease payments that will be made to the state, this project represents a major boost to the local community – economically, environmentally and socially,” Mr Dick said.

According to the report Acciona provided to the Department of Environment and Energy on July 6 (you can click here to view it), the farm will use solar panels with single axis tracking so that harvested sunlight can be maximised. 

“There is an alternative option to install a fixed-tilt mounting structure; however, preliminary studies suggest that the single-axis tracker will be more desirable from an energy production perspective,” the report said.

At maximum capacity (265MW AC), the project is estimated to supply up to 122,000 households (or 5x the amount of households in all of Gladstone). It will have a massive amount of solar panels to reach the 265MW – over one million!

It’s estimated that around 240 solar jobs will be created – with Acciona Energy adopting Buy Queensland and Gladstone Buy Local procurement policies, giving preference to local sub-contractors and manufacturers.

According to the Gladstone Observer, construction is set to run between October next year and November 2020, with the farm operating from Nov 2020 – Dec 2050. Wonder what a solar farm will look like then? 

Read More Solar News:

Darling Downs Solar Update | Jobs, Farms & More

Darling Downs solar is helping the area by providing jobs to locals and kickstarting the economy – with one council already approving $6b worth of wind and solar projects. There’s now a ‘buzz’ around the Darling Downs and renewable energy – let’s take a look at what they have in the pipeline!

Darling Downs Solar 

Darling Downs Solar Farm
Darling Downs Solar Farm (source: Origin Energy)

“We’ve got $1.2 billion of that under construction now, and that’s the exciting thing, this isn’t just about approvals, this is about action to deliver renewable energies to this region,” Western Downs Regional Council mayor Paul McVeigh said in comments to the ABC

“And we know there are another three [solar farms] in the pipeline.”

In Warwick, the 154,000 megawatt-hour generating UQ / Warwick Solar Farm is to be installed on ‘good agricultural land’ has had to wage a battle against NIMBY detractors. Mayor Tracy Dobie defended her decision (she had the deciding vote to allow the farm DA):

“This region is about growth and development and we can sit here and go poor slowly or we can progress our region and the more development we can get in our region the more jobs,” Ms Dobie said.

“The more progress we can make, the better off we are.”

Mayor Dobie continued to discuss the project and what she sees the future of renewable energy in the Darling Downs as looking like:

“This is a turning point in our region to show we are moving forward, that we are looking to the future, and there is nothing more evident than that than renewable energy.

“There’s a buzz about the Darling Downs, this is a great place to be and great time to be here.”

Toowoomba Solar

There’s been an amazing amount of renewable energy movement in Toowoomba – with the billion dollar project at Bulli Creek approved by the Tooowoomba Council. This will be built by Solar Choice over a 10 year staggered period. 

Toowoomba mayor Paul Antonio spoke about the concerns some residents may have and why he’s happy to continue approving solar farms:

“I guess we have to be a bit cautious of the type of land we put it on, but in saying that, the land is restorable, its not going to be destroyed in any mining effort or anything like that, and in 20, 30, 40 years’ time that land will be back to full production.”

Have a look at the short video below from ABC Landline which was part of an article about using ‘good farmland’ for solar farms. 

Read More Solar News:

Susan River Solar Farm Construction Commences

The up-to 100MW and $175m Susan River Solar Farm located between Hervey Bay and Maryborough in Queensland is commencing construction this month after being granted DA in 2016.

Susan River Solar Farm

Susan River Solar Farm
Susan River Solar Farm Mockup (source: http://susanriversolarfarm.com.au/)

The Susan River Solar Farm was granted DA (development approval) by the Fraser Coast Regional Council in December 2016 and is now commencing its construction, with roadworks already underway to ensure the infrastructure is set up correctly before building commences. The project is being developed by one of Australia’s biggest renewable energy developers – ESCO Pacific Pty Ltd. They currently have nine solar farms in various stages of completion – with three under construction (The Ross River Solar Farm, Childers Solar Farm, and Susan River Solar Farms) and six with planning secured. These six are in Rollingstone, Dino, Horsham, Koberinga, Moura, and Finley.

With regards to solar employment at the Susan River Solar Farm, Esco chief executive Steve Rademaker said the project will create up to 300 jobs during its inception and five to ten full-time jobs after the plant’s construction is complete. He went on to explain why the Fraser Coast location was ideal for their solar farm:

“Choosing a location came down to the suitable size identification and proximity to the electrical grid, among other factors,” Mr Rademaker said.

“The Fraser Coast ticked all these boxes. It’s a good location to build a project like this.”

According to the Fraser Coast Chronicle, the project will occupy 176 hectares and will involve the installation of 350,000 PV solar panels. 

Fraser Coast infrastructure councillor Denis Chapman called it a “jewel in the crown” of the Fraser Coast. 

The project doesn’t have a PPA (Purchase Power Agreement) signed yet, which means the farm will sell its output on the spot market once launched (unless they sign one first!).

The utility scale renewable energy project is expected to finish completion next year. 

Read More Solar News:

Cubbie Solar Farm | Solar Power in Resources

Cubbie Solar Farm – Nasdaw listed company VivoPower said this Monday that its wholly owned Australia subsidiary, Aevitas, has been chosen to build the solar project at Cubbie Station in South West Queensland.

Cubbie Solar Farm

Cubbie Solar Farm
Cubbie Solar Farm (source: cubbie.com.au)

Cubbie Station, located in Dirranbandi in South West Queensland, is the largest irrigation property in the southern hemisphere and as such has very significant power and water requirements. Since January 2013, the Cubbie Ag property group is owned by CS Agriculture Pty Ltd. The major stakeholder of this company is Ruyi Australia Group, who manage Australian operations on behalf of Ruyi Group, a Chinese multinational company.  They’ve been spending this year working on getting a solar farm up which will be able to supply around 40% of the station’s power requirements during its peak season (April to September). 

Stage 1 of the project will involve the creation of  3.5MWDC Solar Farm Non-export generation – to do this ~9,800 solar panels will need to be mounted onto a fixed structure and wired through to the inverter. Aevitas Group Limited was awarded the EPC (Engineering design, Procurement and Construction) contract last week, as per a press release posted on the Nasdaq website

Cubbie Ag have a plan for the future as well – they are aiming to provide power to Dirranbandi and St George as the project grows and generates more renewable energy. According to One Step Off The Grid, their goal is to expand the solar farm to 7.2MW and also add battery storage to it.

Solar power in resources and commercial solar have both been growing in leaps and bounds (and often in conjunction) so it’s exciting to see more of these projects coming to fruition. Solar power for farms and business are popping up very frequently. 

The Cubbie Solar Farm is expected to commence construction in October and will be operable by the end of the year.

Read More Solar News:

National Energy Guarantee Approval – Next Steps

National Energy Guarantee Approval – the NEG has been approved by the states and territories of Australia ‘in principle’ – allowing it to move to the next step. There’s still plenty of discussion to go before we see anything signed off, but it’s a step in the right direction for those who believe in the NEG and its ostensible goal of cheaper, more reliable power with less carbon emissions.

National Energy Guarantee Approval

National Energy Guarantee Approval - Malcolm Turnbull
National Energy Guarantee Approval – Malcolm Turnbull (source: yourlifechoices.com.au)

As with most political decisions in this country, there is a lot of posturing and point scoring going on – depending on who you ask, it’s either a ‘great step forward’ or the governments ‘withholding support’. Regardless of the case, the Federal Government has now released a draft of the energy bill which will be taken to next week’s party room meeting for approval. If you want to learn more about what happened with the NEG during the week, please click here

The states want to see detailed legislation and some of them have ‘red line’ conditions which must be met before they fit in to the National Energy Guarantee – there’s still a long way before any of this becomes law in Australia.

Victoria were especially strident in their remarks about the NEG. Victoria’s Energy Minister, Labor’s Lily D’Ambrosio, said agreeing to the plan today would be like signing “with a blindfold on”. advising that they won’t support it unless the following four demands are met:

  1. The emission reduction targets can only ever increase and must not decrease.
  2. Targets need to be set in regulation (this one’s going to be a bit of a problem as Energy Minister Josh Frydenberg has already rejected it).
  3. Emission reduction targets must be set every three years, three years in advance.
  4. Creation of a registry which is transparent and accessible by regulators and governments.

The emissions reduction target in the NEG is to bring down emissions in the electricity sector by 26 per cent by 2030.

COAG Energy Ministers will have another discussion after the Coalition Party Room meeting on Tuesday. Watch this space! We’ll keep you posted.

Read More Solar News: